Name
Affiliation
Papers
R. PASCUAL
Physical Asset Management Lab, Centro de Minería, Pontificia Universidad Católica de Chile, Av. Vicuña Mackenna 4860, Santiago, Chile
19
Collaborators
Citations 
PageRank 
35
82
10.83
Referers 
Referees 
References 
207
289
125
Search Limit
100289
Title
Citations
PageRank
Year
Joint Pricing And Maintenance Strategies In Availability-Based Product-Service Systems Under Different Overhaul Conditions00.342021
A real options approach for joint overhaul and replacement strategies with mean reverting prices00.342020
Corrigendum to "Reliability Assessment Methodology for Massive Manufacturing Using Multi-Function Equipment".00.342018
Graphical analysis for overall effectiveness management: A graphical method to support operation and maintenance performance assessment.00.342018
Reliability Assessment Methodology for Massive Manufacturing Using Multi-Function Equipment.10.632018
Technology Investment Effects In Performance-Based Maintenance Contracts10.362018
An asset-management oriented methodology for mine haul-fleet usage scheduling.00.342018
Optimal Channel Coordination In Use-Based Product-Service System Contracts20.382017
Optimal repairable spare-parts procurement policy under total business volume discount environment.20.372017
A decision-making framework to integrate maintenance contract conditions with critical spares management.00.342014
Critical spare parts ordering decisions using conditional reliability and stochastic lead time.50.482013
Joint optimization of fleet size and maintenance capacity in a fork-join cyclical transportation system.30.432013
Throughput centered prioritization of machines in transfer lines30.532011
Optimization models for critical spare parts inventories - a reliability approach80.702011
Optimal inspection intervals for safety systems with partial inspections.10.372011
A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data252.122009
Business-oriented prioritization: A novel graphical technique30.592009
Optimal maintenance service contract negotiation with aging equipment221.192008
On the effect of downtime costs and budget constraint on preventive and replacement policies60.652008