Title
An asset-management oriented methodology for mine haul-fleet usage scheduling.
Abstract
•We propose an original mixed integer programming formulation to optimize mine haulage equipment scheduling in the long term.•The model considers the effects of equipment aging, fuel consumption, payload capacity and cycle times.•The model considers joint minimization of fuel, M&R, and overhaul costs.•The case study shows a cost reduction of 13% in the discounted flows associated with total costs in a time horizon of 10 years.
Year
DOI
Venue
2018
10.1016/j.ress.2018.07.034
Reliability Engineering & System Safety
Keywords
Field
DocType
Physical asset management,Greenhouse gas emissions,Mixed integer programming model,Haulage fleet scheduling
Truck,Time horizon,Scheduling (computing),Engineering,Fuel efficiency,Asset management,Reliability engineering,Cost reduction,Greenhouse gas,Environmental economics,Haulage
Journal
Volume
ISSN
Citations 
180
0951-8320
0
PageRank 
References 
Authors
0.34
8
5
Name
Order
Citations
PageRank
C. Nakousi100.34
R. Pascual28210.83
A. Anani300.68
Fredy Kristjanpoller412.32
P. Lillo500.34