Dynamic vehicle allocation control for automated material handling system in semiconductor manufacturing. | 1 | 0.36 | 2013 |
Dynamic production control in parallel processing systems under process queue time constraints | 4 | 0.46 | 2012 |
Dynamic selling of quality-graded products under demand uncertainties | 2 | 0.37 | 2011 |
A stochastic programming model for strategic capacity planning in thin film transistor-liquid crystal display (TFT-LCD) industry | 1 | 0.35 | 2011 |
A model for batch available-to-promise in order fulfillment processes for TFT-LCD production chains | 10 | 0.72 | 2010 |
One Stop Service: The Case of Senao International Co., Ltd.. | 0 | 0.34 | 2009 |
A modified particle swarm optimization for production planningproblems in the TFT Array process | 8 | 0.56 | 2009 |
A SCOR-Based Methodology forAnalyzing and Designing Supply Chain. | 0 | 0.34 | 2005 |
An RFID Application Model for the Publication Industry: A Taiwan Perspective. | 3 | 0.84 | 2005 |
A Multi-site PlanningApproach for theTFT-LCD Production Chain 193 . | 0 | 0.34 | 2005 |
A Hierarchy Planning Model forTFT-LCD Production Chain. | 4 | 1.52 | 2004 |
A CPFRR Implementation Methodology Study - XA Carpenter Mechanical Industry Case Study. | 2 | 0.40 | 2004 |
KPI with Data Flow Analysis for CPFR: A CMC Case Study. | 1 | 0.35 | 2003 |
Algorithms for sequencing robot activities in a robot-centered parallel-processor workcell | 4 | 2.27 | 1993 |
Representation Scheme For Defining And Operating Form Features | 6 | 0.98 | 1993 |
A framework for designing an animated simulation system based on model-animator-scheduler paradigm | 1 | 0.36 | 1992 |