A heuristic-based hybrid solution for parallel machine scheduling problems with earliness and tardiness penalties | 1 | 0.36 | 2003 |
Modeling and genetic solution of a class of flexible job shop scheduling problems | 2 | 0.42 | 2001 |
Building up Embodiment in Learning Agents Using A Gaussian Radial Basis Function Neural Network. | 0 | 0.34 | 2000 |
Autonomous trajectory generation of a biped locomotive robot using neuro oscillator | 5 | 0.69 | 1993 |
Learning Control System of Biped Locomotive Robot Using Neural Networks. | 0 | 0.34 | 1993 |
Kraft: An Autonomous Robot Manipulation System Based on Geometrical Modeling and Processing. | 0 | 0.34 | 1992 |
Trajectory Generation of a Biped Locomotive Robot. | 0 | 0.34 | 1990 |