Title | ||
---|---|---|
A case of rule-based heuristics for scheduling hot rolling seamless steel tube production |
Abstract | ||
---|---|---|
A production scheduling problem for hot rolling seamless steel tube at Tianjin Pipe Corporation of China is studied. Considering the complexity of the problem and the acceptable time for solving it, a rule-based heuristic approach is proposed and implemented. The proposed approach is a bottleneck scheduling method and considers simultaneously all production processes in three production units and 'optimizes' them as a whole. Additionally, the running result shows, on average, that a 3% increase in throughput and a 5% reduction in late deliveries have been achieved since the system implementation. |
Year | DOI | Venue |
---|---|---|
2006 | 10.1111/j.1468-0394.2006.00330.x | EXPERT SYSTEMS |
Keywords | Field | DocType |
scheduling,heuristics,hot rolling seamless steel tube production | Bottleneck,Data mining,Rule-based system,Heuristic,Industrial engineering,Scheduling (computing),Simulation,Computer science,Implementation,Scheduling (production processes),Heuristics,Throughput | Journal |
Volume | Issue | ISSN |
23.0 | 3.0 | 0266-4720 |
Citations | PageRank | References |
0 | 0.34 | 7 |
Authors | ||
4 |
Name | Order | Citations | PageRank |
---|---|---|---|
Jianxiang Li | 1 | 36 | 4.94 |
Ling Li | 2 | 1 | 1.76 |
Lixin Tang | 3 | 1040 | 88.80 |
Huijiang Wu | 4 | 0 | 0.68 |