Abstract | ||
---|---|---|
In this paper, an improved multiperiod risk-limiting dispatch (IMRLD) is proposed as an operational method in power systems with high percentage renewables integration. The basic risk-limiting dispatch (BRLD) is chosen as an operational paradigm to address the uncertainty of renewables in this paper due to its three good features. In this paper, the BRLD is extended to the IMRLD so that it satisfi... |
Year | DOI | Venue |
---|---|---|
2017 | 10.1109/TII.2017.2651146 | IEEE Transactions on Industrial Informatics |
Keywords | Field | DocType |
Measurement,Optimization,Power transmission lines,Uncertainty,Load modeling,Real-time systems | Numerical tests,Economic dispatch,Mathematical optimization,Convexity,Renewable energy,Computer science,Electric power system,Electric power transmission,Electric power industry,Limiting | Journal |
Volume | Issue | ISSN |
13 | 4 | 1551-3203 |
Citations | PageRank | References |
0 | 0.34 | 6 |
Authors | ||
6 |
Name | Order | Citations | PageRank |
---|---|---|---|
chaoyi peng | 1 | 0 | 1.01 |
Yunhe Hou | 2 | 114 | 22.07 |
Nanpeng Yu | 3 | 39 | 11.35 |
jie yan | 4 | 0 | 1.01 |
shunbo lei | 5 | 20 | 5.52 |
weisheng wang | 6 | 15 | 2.16 |