Title
Common due window assignment scheduling with proportional linear deterioration effects
Abstract
In this paper, single-machine scheduling problems with proportional linear deterioration effects and common due window assignment simultaneously are considered. Two different objective functions are studied, the first is to minimize the sum of the number of early jobs, number of tardy jobs and due window location and due window size, the second is to minimize the sum of the earliness cost, tardiness cost, due window location and due window size. Optimality properties for all problems are provided and polynomial time algorithms for solving these problems are given.
Year
DOI
Venue
2020
10.1142/S0217595919500313
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH
Keywords
DocType
Volume
Scheduling,due window assignment,deteriorating job
Journal
37
Issue
ISSN
Citations 
1
0217-5959
0
PageRank 
References 
Authors
0.34
0
4
Name
Order
Citations
PageRank
Xue Huang1312.32
Na Yin2373.10
Wei-Wei Liu300.34
Jibo Wang474541.50