Title
A new algorithm for resource-constrained project scheduling with breadth and depth of skills
Abstract
•We introduce a new problem that handles the breadth and depth of resources and deals with variable activity duration.•A state-of-the-art algorithm is proposed with a new representation, a new crossover and two new problem-specific local searches.•A new data generation procedure is proposed.•Computational experiments are provided in which the new algorithm is compared to several benchmark approaches.
Year
DOI
Venue
2021
10.1016/j.ejor.2020.10.032
European Journal of Operational Research
Keywords
DocType
Volume
Project scheduling,Resource-constrained scheduling,Multi-skilled resources,Genetic algorithm
Journal
292
Issue
ISSN
Citations 
1
0377-2217
0
PageRank 
References 
Authors
0.34
0
2
Name
Order
Citations
PageRank
Jakob Snauwaert100.34
M Vanhoucke291955.85