M VANHOUCKE
79
48
Citations 
PageRank 
Referers 
919
55.85
1507
Referees 
References 
1003
1011
Search Limit
1001000
Title
Citations
PageRank
Year
An Analytical Model For Budget Allocation In Risk Prevention And Risk Protection00.342021
A new algorithm for resource-constrained project scheduling with breadth and depth of skills00.342021
Using Schedule Risk Analysis with resource constraints for project control00.342021
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling00.342020
A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems.00.342020
Project schedule performance under general mode implementation disruptions.00.342020
Analysing The Impact Of Alternative Network Structures On Resource-Constrained Schedules: Artificial And Empirical Experiments00.342020
Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs00.342020
Multi-mode schedule optimisation for incentivised projects00.342020
Computing project makespan distributions: Markovian PERT networks revisited.00.342019
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints.10.342019
Tolerance limits for project control: An overview of different approaches.00.342019
Resource-constrained project scheduling with activity splitting and setup times.10.342019
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models.10.342019
The impact of applying effort to reduce activity variability on the project time and cost performance.10.352019
An agency perspective for multi-mode project scheduling with time/cost trade-offs.00.342019
Fitting activity distributions using human partitioning and statistical calibration.00.342019
A Statistical Method for Estimating Activity Uncertainty Parameters to Improve Project Forecasting.00.342019
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules00.342019
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs.10.342019
A tool to test and validate algorithms for the resource-constrained project scheduling problem.30.372018
Maximising the weighted number of activity execution modes in project planning.00.342018
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem.30.402018
An exact composite lower bound strategy for the resource-constrained project scheduling problem.10.402018
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem.00.342017
A resource type analysis of the integrated project scheduling and personnel staffing problem20.362017
A buffer control method for top-down project control.30.422017
On the resource renting problem with overtime.00.342017
A parallel multi-objective scatter search for optimising incentive contract design in projects.10.372017
A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence.20.362017
Capital- and resource-constrained project scheduling with net present value optimization.50.422017
A metaheuristic solution approach for the time-constrained project scheduling problem.10.352017
The integration of constrained resources into top-down project control.10.372017
A comparative study of Artificial Intelligence methods for project duration forecasting30.412016
Payment models and net present value optimization for resource-constrained project scheduling.80.452016
An approach using SAT solvers for the RCPSP with logical constraints.70.572016
An exact algorithm for an integrated project staffing problem with a homogeneous workforce30.382016
Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem.150.722015
Blended Learning in Project Management - Experiences on Business Games and Case Studies.00.342015
Influence of learning in resource-constrained project scheduling80.552015
A multivariate approach for top-down project control using earned value management60.502015
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances.391.332014
A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective.30.422014
Analysis of the Integration of the Physician Rostering Problem and the Surgery Scheduling Problem850.952014
An artificial immune system based approach for solving the nurse re-rostering problem30.392013
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups70.492012
A hybrid dual-population genetic algorithm for the single machine maximum lateness problem50.442011
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem.30.412011
Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber30.422011
A hybrid single and dual population search procedure for the job shop scheduling problem.60.472011