Scheduling Pre-Emptible Tasks With Flexible Resourcing Options And Auxiliary Resource Requirements | 0 | 0.34 | 2021 |
A real-world transport scheduler applied to Australian sugarcane industry | 0 | 0.34 | 2020 |
A flexible job shop scheduling approach with operators for coal export terminals – A mature approach | 0 | 0.34 | 2020 |
A flexible job shop scheduling approach with operators for coal export terminals. | 0 | 0.34 | 2019 |
An integrated approach for scheduling health care activities in a hospital. | 5 | 0.42 | 2018 |
A capacity assessment approach for multi-modal transportation systems. | 1 | 0.35 | 2017 |
A mixed integer linear programing approach to perform hospital capacity assessments. | 0 | 0.34 | 2017 |
A multi-criteria approach for hospital capacity analysis. | 4 | 0.42 | 2016 |
Optimization models for expanding a railway's theoretical capacity | 0 | 0.34 | 2016 |
Multi-objective models and techniques for analysing the absolute capacity of railway networks. | 3 | 0.44 | 2015 |
Performance profiling for predictive train schedules | 2 | 0.38 | 2014 |
Determining operations affected by delay in predictive train timetables | 3 | 0.40 | 2014 |
An integrated approach for earthwork allocation, sequencing and routing. | 9 | 0.75 | 2014 |
A disjunctive graph model and framework for constructing new train schedules | 10 | 0.58 | 2010 |
A sequencing approach for creating new train timetables | 9 | 0.60 | 2010 |
Techniques for restricting multiple overtaking conflicts and performing compound moves when constructing new train schedules | 3 | 0.40 | 2009 |
Scheduling Trains on Parallel Lines with Crossover Points | 2 | 0.43 | 2009 |
Analysing the performance of an automated pathology specimen handling system | 2 | 0.38 | 2008 |
The Assignment of Individual Renewable Resources in Scheduling. | 0 | 0.34 | 2004 |
Evolutionary Algorithms For Resource Constrained Non-Serial Mixed Flow Shops | 2 | 0.37 | 2003 |