A bi-objective optimisation of post-disaster relief distribution and short-term network restoration using hybrid NSGA-II algorithm | 0 | 0.34 | 2022 |
A multi-vehicle covering tour problem with speed optimization | 0 | 0.34 | 2022 |
Stochastic Optimization For Flow-Shop Scheduling With On-Site Renewable Energy Generation Using A Case In The United States | 0 | 0.34 | 2020 |
Distributionally Robust Optimization for a Resilient Transmission Grid During Geomagnetic Disturbances. | 0 | 0.34 | 2019 |
Two-Stage Hybrid Flow Shop Batching And Lot Streaming With Variable Sublots And Sequence-Dependent Setups | 1 | 0.35 | 2019 |
Stochastic Optimization for Energy Management in Power Systems With Multiple Microgrids. | 3 | 0.38 | 2019 |
On scheduling a photolithography area containing cluster tools. | 0 | 0.34 | 2018 |
Resilient Off-Grid Microgrids: Capacity Planning and N-1 Security. | 0 | 0.34 | 2018 |
Assessing The Cost Impact Of Multiple Transportation Modes To Enhance Sustainability In An Integrated, Two Stage, Automotive Supply Chain | 0 | 0.34 | 2017 |
Robust semiconductor production planning under yield uncertainty. | 0 | 0.34 | 2016 |
Integrated cost optimization in a two-stage, automotive supply chain | 2 | 0.40 | 2016 |
A bi-criteria hybrid metaheuristic for analysing an integrated automotive supply chain. | 0 | 0.34 | 2016 |
Scheduling parallel machines with single vehicle delivery | 1 | 0.36 | 2014 |
Supply network design: Risk-averse or risk-neutral? | 1 | 0.36 | 2014 |
Multiple orders per job formation and release strategies in large-scale wafer fabs: a simulation study | 2 | 0.37 | 2011 |
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. | 81 | 2.97 | 2011 |
Integrated heuristics for scheduling multiple order jobs in a complex job shop | 4 | 0.45 | 2010 |
Scheduling multiple orders per job in a single machine to minimize total completion time | 8 | 0.57 | 2010 |
Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems | 22 | 0.95 | 2010 |
A column generation heuristic for complex job shop multiple orders per job scheduling | 2 | 0.44 | 2010 |
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, WSC 2008, InterContinental Hotel, Miami, Florida, USA, December 7-10, 2008 | 363 | 53.79 | 2008 |
Multiple orders per job batch scheduling with incompatible jobs | 6 | 0.63 | 2008 |
Column generation heuristics for multiple machine, multiple orders per job scheduling problems | 8 | 0.77 | 2008 |
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities | 16 | 0.90 | 2008 |
Determining an appropriate number of foups in semiconductor wafer fabrication facilities | 2 | 0.46 | 2008 |
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times | 8 | 0.57 | 2007 |
Multi-Objective Semiconductor Manufacturing Scheduling: A Random Keys Implementation of NSGA-II | 6 | 0.70 | 2007 |
Simulating transportation practices in multi-indenture multi-echelon (MIME) systems | 0 | 0.34 | 2004 |
Semiconductor manufacturing: using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility | 14 | 1.22 | 2002 |
Scheduling and dispatching: scheduling batch processing machines in complex job shops | 0 | 0.34 | 2001 |
Sizing a pilot production line using simulation | 2 | 1.44 | 2001 |
Semiconductor manufacturing scheduling: maximizing delivery performance in semiconductor wafer fabrication facilities | 0 | 0.34 | 2000 |
A comparison study of the logic of four wafer fabrication simulators | 3 | 1.25 | 1996 |