Bridging the Gap between fab simulation and supply Chain Forecast. | 0 | 0.34 | 2018 |
Operator Resource modelling in a Multiple wafer Sizes fabrication Environment using discrete Event simulation. | 0 | 0.34 | 2018 |
Harmonizing operations management of key stakeholders in wafer fab using discrete event simulation | 0 | 0.34 | 2017 |
An easy approach to extending a short term simulation model for long term forecast in semiconductor industry | 0 | 0.34 | 2017 |
Simulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line. | 0 | 0.34 | 2016 |
Symbiotic simulation for optimisation of tool operations in semiconductor manufacturing | 1 | 0.40 | 2011 |
Making use of prognostics health management information for aerospace spare components logistics network optimisation | 5 | 0.51 | 2011 |
Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab | 3 | 0.46 | 2011 |
Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities | 9 | 1.33 | 2010 |
Unlocking value from component exchange contracts in aviation using simulation-based optimisation | 4 | 0.61 | 2010 |
Symbiotic Simulation Control in Semiconductor Manufacturing | 11 | 0.94 | 2008 |
Predictive-conservative synchronization for commercial simulation package interoperability | 2 | 0.37 | 2008 |
An optimization framework for waferfab performance enhancement | 2 | 0.37 | 2008 |
Preventive what-if analysis in symbiotic simulation | 5 | 0.51 | 2008 |
Interoperating Simulations of Automatic Material Handling Systems and Manufacturing Processes | 6 | 0.66 | 2006 |
Development and analysis of a customer-demand-driven semiconductor supply chain model using the High Level Architecture | 7 | 0.62 | 2006 |
Shared State Synchronization for HLA-Based Distributed Simulation | 5 | 0.56 | 2006 |
Simulation Analysis on the Impact of Furnace Batch Size Increase in a Deposition Loop | 4 | 0.52 | 2006 |
A COTS simulation package emulator (CSPE) for investigating COTS simulation package interoperability | 9 | 1.10 | 2005 |
Interoperating AutoSched AP using the High Level Architecture | 14 | 0.95 | 2005 |
Using Manufacturing Process Flow for Time Synchronization in HLA-Based Simulation | 8 | 0.65 | 2005 |
An integrated and adaptive decision-support framework for high-tech manufacturing and service networks | 14 | 0.91 | 2005 |
Algorithms for HLA-based distributed simulation cloning | 19 | 0.88 | 2005 |
HLA-Based Distributed Simulation Cloning | 5 | 0.66 | 2004 |
Analysis of a borderless fab scenario in a distributed simulation testbed | 6 | 0.77 | 2004 |
Optimistic synchronization in HLA based distributed simulation | 21 | 1.61 | 2004 |
Analysis of a customer demand driven semiconductor supply chain in a distributed simulation test bed | 8 | 0.74 | 2004 |
Incremental HLA-based distributed simulation cloning | 4 | 0.51 | 2004 |
Commercial-off-the-shelf distributed simulation, panel: HLA-CSPIF panel on commercial off-the-shelf distributed simulation | 4 | 0.83 | 2003 |
Alternative Solutions for Distributed Simulation Cloning. | 9 | 0.80 | 2003 |
Distributed simulation and manufacturing: synchronization and management of shared state in HLA-based distributed simulation | 5 | 0.76 | 2003 |
Evaluating Alternative Solutions for Cloning in Distributed Simulation | 5 | 0.69 | 2003 |
The process of process reengineering: integration of discrete event simulation models with framework-based business applications | 5 | 0.72 | 2003 |
Panel discussion on distributed simulation and industry: potentials and pitfalls: distributed simulation and industry: potentials and pitfalls | 5 | 0.78 | 2002 |
Distributed simulation with incorporated APS procedures for high-fidelity supply chain optimization | 22 | 1.77 | 2001 |
Managing event traces for a web front-end to a parallel simulation | 0 | 0.34 | 2001 |
Hierarchical federations: an architecture for information hiding | 21 | 2.48 | 2001 |
Parallel Federates - An Architecture for Hybrid Distributed Simulation | 2 | 0.67 | 2001 |
Load balancing for conservative simulation on shared memory multiprocessor systems | 37 | 1.76 | 2000 |
Adapting a supply-chain simulation for HLA | 17 | 2.14 | 2000 |
Manufacturing sypply chain management: distributed supply chain simulation across enterprise boundaries | 25 | 2.17 | 2000 |